What are some required inspections for typical projects?
- Swimming pool site location
- Footing forms & trenches
- Foundation and backfill
- Footing drains
- Outlet for footing drains
- Framing
- Insulation
- Septic connection from house
- Gravel under slab
- Plumbing rough-in
- Plumbing under slab
- Plumbing final
- Plot plan
- Foundation location
- Final plot plan
- Final C of O (certificate of occupancy)
- and any and all other inspections as designated by the Building Inspector or Village Engineer.